ITA Network Solutions UK maintains servers worldwide. The company is represented around the globe by daugther comapanies which run and operate
servers located in our own or data centers operated by our partners. Currently we are operating servers located in the USA (in association with ev1) and Europe (in association with EuroNet).
Providing quality shared and dedicated hosting solutions to small and corporate customers.
Redundant network cores in both data centers
A fully redundant network means that if a router or high-level network appliance
goes down, there is no loss of service.
Individual router per gigabit link
If any router fails, it can only affect one network link, eliminating a major
point of failure other competitors allow.
Gigabit cross-connects between both data centers
Data moves quickly between data centers. And if one data center were to
experience network connectivity issues, it could simply route data out through
the other.
RouteScience at both data centers
Our systems can measure the latency of certain network routes and send client
data along the best possible route out to the Internet.
Advanced virus, worm and anti-DoS protection on all network cores
Our goal is to stop attacks before they occur while keeping the safe traffic
flowing at top speed.
| |
Data Center 1 |
Data Center 2 |
| Overview |
Service precautions to the maximum
Your business depends on the stability of the service. Data Center 1 is a world-class study in maximum security
and power fortification.
Redundant power to the network
All 18 backbone routers and top-level network equipment are fed from
multiple power feeds, reducing the exposure to power equipment failure.
Redundant fiber connections
Every gigabit Ethernet connection (and DC1 has 15) arrives from two
sources and enters the facility at different points.
Spare parts on hand
From cages and racks to network and server parts, they are ready to be replaced
at any time, as a preventive measure, or in the event of a
failure.
|
Fantastic uptime
The newest data center uses high-quality Dell hardware. And,
as you would expect, this provides a level of security and stability
worthy of one of the busiest data centers in the world. As an extra
precaution, a team of technical experts is on hand nonstop, ready to
spring into action in the rare event of a service breach. Take a look at
what is at work here.
Redundant power to the network
All 10 backbone routers and top-level network equipment are fed from
multiple power feeds, reducing the exposure to power equipment failure.
Redundant fiber connections
Every gigabit Ethernet connection (and DC2 has 13) arrives from two
sources and enters the facility at different points.
Spare parts on hand
From cages and racks to network and server parts, they are ready to be replaced
at any time, as a preventive measure, or in the event of a
failure.
|
| Municipal |
Vendor: CenterPoint
Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers
Service level: Critical Customer -
similar to Hospital Service level
|
Vendor: CenterPoint
Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers
Service level: Critical Customer -
similar to Hospital Service level |
| Generators |
Generator
1
Power Plant: 16 Cylinder 3000 horse power Cummins
Marine
Grade Diesel Gen Set:ONAN
Wattage: 1250 Kw
Deployment: Zone
Generator 2
Power Plant: 16 Cylinder 3000 horse power Cummins
Marine
Grade Diesel Gen Set:ONAN
Wattage: 1500 Kw
Deployment: Zone
Each Generator is responsible for
power in a specific zone of Datacenter 1.
The Power plants are tested weekly.
The Generators are load tested monthly.
The system is inspected quarterly.
|
Generator
1
Power Plant: 16 Cylinder 3000 horse
power Cummins
Marine
Grade Diesel Gen Set:ONAN
Wattage: 2000 Kw
Deployment: Load Sharing
Generator 2
Power Plant: 16 Cylinder 3000 horse power Cummins
Marine
Grade Diesel Gen Set: ONAN
Wattage: 2000 Kw
Deployment: Load Sharing
Generator 3
Power Plant: 16 Cylinder 3000 horse power Cummins
Marine
Grade Diesel Gen Set: ONAN
Wattage: 2000 Kw
Deployment: Load Sharing
All three Generators share the load at DC2 with the help of paralleling
gear. When a service outage occurs all three generators will start for 10
minutes. If the total load is less then 60% of capacity of one generator,
then the other generators will shutdown automatically. If the load reaches
80% of capacity of one generator the other generators will restart
The Power plants are tested weekly.
The Generators are load tested monthly.
The system is inspected quarterly.
|
| Power Switching |
In the event of a service outage from CenterPoint,
the generators will turn over and power will be switched automatically in
seconds. This system is tested every month. |
In the event of a service outage from CenterPoint,
the generators will turn over and power will be switched automatically in
seconds. This system is tested every month. |
| UPS |
Currently there are 5 375 Kw Mitsubishi |
Currently there are 4-375 and 4-500 KVA Mitsubishi |
| Cooling Units |
AC Units: Data
Aire 30 Ton
Number of Units: 30
Total tonnage: 900 Tons
Total amps pulled for cooling: 1130 amps
|
AC Units: Liebert
30 Ton
Number of Units: 34
Total tonnage: 1020 Tons
Total amps pulled for cooling: 2400 amps |
| Pictures |







}




|
Our strength is our Support and dedicated servers management and we are proud of it. Our main Support Center is now located in Europe. We employ highly trained young professionals who are able to answer all
customer queries in several languages.
We do not offer phone support , which helps us to reduce the cost of our service. Our Ticketing System, has been specially designed to improve the quality of the service provided and
has already proven its efficiency.